A 100 pound person would weigh 800 pounds on. Jupiter ,the ratio would be 800:500
Answer:
4.2 kanban containers required
Step-by-step explanation:
Given the following information :
Waiting time = 0.25 days
Average peocessing time = 0.15 days / container
Daily usage (Demand rate) = 2000 per day
Container capacity = 200 wheels
Policy variable ( Alpha) = 5% = 0.05
Therefore, number of kanban containers needed for the wheels can be calculated using:
(Number of containers(x) * container size) = (Demand rate (waiting time + processing time)*(1 + alpha))
x * 200 = 2000(0.25 + 0.15)*(1 + 0.05)
200x = 2000(0.40)*(1.05)
200x = 840
x = 840 / 200
x = 4.2
4.2 kanban containers required
Answer:
its 5
Step-by-step explanation:
it five bc look at the mesuarement
Set the equation equal to each other: 6x-1 = 8x+7 then solve
Answer:
91
Step-by-step explanation:
8x13=104-13=91 I have done this problem before on big ideas and it is either this or 87