Answer:
Since there are two of 112 blocks, it will be 112 ÷ 2

84% of a contractor’s jobs involves electrical work. 75% of a contractor’s jobs involve plumbing work. Of the jobs that involve plumbing, 90% of the jobs also involves electrical work. Let E = jobs involving electrical work L = jobs involving plumbing work Suppose one of the contractor’s jobs is randomly selected. Using the sixth Excel worksheet, a) Find P(E). 0.84 b) Find P(L). 0.75 c) In words, what does E | L mean? d) Find P(E | L). e) Find P(E and L). f) Are E and L independent events? Why or why not? g) Find P(E or L).
Answer:
78.0 kilo
Step-by-step explanation:
85.8- 93.6= 7.8
101.4-93.6= 7.8
85.8-7.8 = 78.0 kilo
Answer:
0.01 to 0.99, the multiplier in scientific notation always has to be a decimal less than 1 and greater than 0.
Step-by-step explanation:
Answer:
I am going to say x3
Step-by-step explanation: