You can use substitution for this.
x+5 = 5x -11
Combine like terms
16=4x
Divide 4 on both sides to isolate the x
x=4
Plug x=4 to one of the equations
y= 4 +5
Combine like terms
y=9
So the answer is A. (4,9)
I hope this helps you out a bunch hun :)
This kind of problems requires to add the working velocities. The total velocity is the sum of the individual velocities.
Anita's velocity = 1 pool/8 hours
Chao's velocity = 1 pool/6 hours
Combined velocity 1/8 + 1/6 = (3 + 4)/24 = 7/24 pool/hour
Time = 1 pool / (7/24) pool/hour = 24/7 hour =3.43 hours
Total height of lumber, H = 10 1/2 feet = 21/2 feet .
Height of side panel, h = 5 2/3 feet = 17/3 feet .
Now,
Extra lumber required, L = 2 × Height of side panel - Total height of lumber
![L=[2\times (\dfrac{17}{3})]-\dfrac{21}{2}\\\\L = \dfrac{5}{6}\ feet](https://tex.z-dn.net/?f=L%3D%5B2%5Ctimes%20%28%5Cdfrac%7B17%7D%7B3%7D%29%5D-%5Cdfrac%7B21%7D%7B2%7D%5C%5C%5C%5CL%20%3D%20%5Cdfrac%7B5%7D%7B6%7D%5C%20feet)
Therefore, extra lumber required is
feet.
Hence, this is the required solution.
The first machine does 200 in 1 hour, so in 8.5 hours it will then do 200 * 8.5.
the second machine does 180 in 1 hour, so in 8.5 hours it will then do 180 * 8.5.
the third machine does 150 in 1 hour, so in 8.5 hours it will do then 150 * 8.5.
how many bottles will they all do in total on that time?
(200 * 8.5) + (180 * 8.5) + (150 * 8.5)