Answer: kindly check explanation
Explanation: Risk as related to a project may be reffered to as occurrences or factors which could affect a project, they may not always be negative as usually perceived, they may be positive. Hence, when a perceived negative risk is perceived, it is essential to escalate and ensure that the necessary stakeholders become aware so as to find ways of mitigating or avoiding such happening.
In the case of positive risk or opportunity, escalating is equally important as it ensures relevant executives are aware and hence work on ways or processes to foster, embrace and exploit the advantage.
Answer:
The correct answer is letter "D": direct material and conversion costs are traced to each batch of product produced.
Explanation:
The operation-costing system is based on the principle that in large entities where manufacturing is almost the same for all products, costs can be assigned to units produced and the result of adding all those costs should equal the costs assigned in groups of units produced or batches.
<em>Conversion costs are a combination of direct labor and manufacturing overhead costs. Conversion costs are traced by adding the direct costs to the conversion costs of an operation day by the number of units produced in the day.</em>
Answer:
$16,200 favorable
Explanation:
The computation of the total controllable cost variance is shown below:
= Budgeted overhead - actual overhead
= (40,000 units × $3.80 + $74,000) - $209,800
= ($152,000 + $74,000) - $209,800
= $226,000 - $209,800
= $16,200 favorable
Hence, the total controllable cost variance is $16,200 favorable
C- “Erik bought a good book: he read it in one afternoon” has proper punctuation and capitalization.
Explanation: In A, “book, he read it” is wrong. In B and D, they capitalize “He” in “he read it” despite it not being a new sentence. None of these work, leaving C.
D. Even though the shipping time is longer, they should order the imported materials because they are less expensive and should arrive in plenty of time to build the product.
They have two years to build the product. They should go with low cost to save for unforseen complications, like unexpected increase in assembly price.