Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
= 
and of smaller belt is,
= 
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport
(t) cans per minute.</em>
Thus the equation becomes,

t = 
Answer:
Step-by-step explanation:
P(x) = R(x) - C(x)
Where,
P(x) = Total profit
R(x) = Total revenue
C(x) = Total cost
R(x)equals150.97 x minus 0.3 x squared
R(x) = 150.97x - 0.3x^2
Upper C left parenthesis x right parenthesis equals 4529.10 plus 0.5 x squared.
C(x) = 4529.10 + 0.5x^2
P(x) = R(x) - C(x)
= (150.97x - 0.3x^2) - ( 4529.10 + 0.5x^2)
= 150.97x - 0.3x^2 - 4529.10 - 0.5x^2
= 150.97x - 0.8x^2 - 4529.10
P(x) = -0.8x^2 + 150.97x - 4529.10
5
reason is because if you’re pentagon has lines of 5 then the area would be 25
Answer:
48
Step-by-step explanation:
27+36-15=63-15=48
Answer:
isosceles triangle
Step-by-step explanation: