1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vovangra [49]
3 years ago
14

Please help me with both one and two. Thanks!!

Mathematics
1 answer:
lesya [120]3 years ago
3 0
1. a²+b²=c²
a=6²=36
b=x²
c=15²=225
x=√189 feet deep (the square root of 189)
2. a²+b²=c²
a=3²=9
b=x²
c=5²=25
x=√16=4

Hope that helped
;)
You might be interested in
Help please easy 8th grade math!!!❤️❤️❤️❤️❤️❤️❤️❤️❤️The ages of Moe, Larry, and Curly are consecutive odd numbers, where Moe is
Ludmilka [50]

Moe, 3 Larry, 1

Step-by-step explanation:

5 0
3 years ago
how many leaves on a tree diagram are needed to represent all possible combinations tossing a coin 3 times
Lelechka [254]
I believe you would do 2 times 3, which gives you 6. 3 is for the number of coin tosses, and 2 is the number of sides of a coin.
6 0
3 years ago
What is the slope of the graph?
kumpel [21]
Th evalope kf the line is -3
8 0
4 years ago
Juliette is making a fruit salad.she purchased 9 2/3 ounces each of 6 different fruits . how many ounces of fruit did she purcha
Anettt [7]
9 2/3 total ounces is a total split up among 6 fruits.

So we need to divide 9 2/3 among the 6 fruits.

= 9 2/3 divide 6

= change 9 2 / 3 in improper fraction
= 9*3 + 2/3

= 29/3 divided by 6/1

= 29/3 x 1/6

= 29/18, change that to mixed fractions.

The answer is 1 11/18 ounces of each fruit.
3 0
3 years ago
He total variance is $35000 f. the total materials variance is $14000 f. the total labor variance is twice the total overhead va
TiliK225 [7]
Assume that the total overhead variance is x
We are given that the total labor variance is twice the total overhead variance. This means that, the total labor variance is 2x

Total variance can be calculated as follows:
Total variance = Total materials variance + Total overhead variance
                          + Total labor variance

We have:
Total variance = $35000
Total materials variance = $14000
Total overhead variance = x
Total labor variance = 2x

Substitute in the equation and solve for x as follows:
35000 = 14000 + x + 2x
35000 - 14000 = 3x
21000 = 3x
x = 21000/3
x = 7000

Based on the above calculations:
Total overhead variance = x = $7000
Total labor variance = 2x = 2*7000 = $14000
4 0
3 years ago
Other questions:
  • The radius of a cylinder is always half of its diameter. True False
    9·2 answers
  • Simplify using only positive exponents.(3p )(2prs)
    5·1 answer
  • 5 times a number increased by 8
    15·2 answers
  • Find the product of (n4+7)2
    12·1 answer
  • The_______ coordinate located at the highest or lowest point on a parobla​
    6·1 answer
  • For every 1,000 pounds of water in the ocean, there are 35 pounds of salt. If a person takes 173 pounds of ocean water, how much
    7·1 answer
  • What is the solution to this system of equations? 4x + 5y = 7
    9·1 answer
  • For what value of n is n-2] + 2 equal to 0?
    15·1 answer
  • 1 Yvonne is saving money for college, and currently has $1200 in a savings account. She plans to deposit $30 each week from her
    7·1 answer
  • Bath and Body Works is having a special promotion on fall candles. Every 12th guest is receiving a free pumpkin scented candle a
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!