Answer:
C) 2
Step-by-step explanation:
step 1: Find mean of data set
2+4+4+5+7+8 = 30
30/6 = 5
Mean = 5
step 2: subtract each data value from the mean and square it
5-2 = 3; 3² = 9
5-4 = 1; 1² = 1
5-4 = 1; 1² = 1
5-5 = 0; 0² = 0
5-7 = -2; (-2²) = 4
5-8 = -3; (-3²) = 9
Add the squared results:
9+1+1+0+4+9 = 24
Divide 24 by 6 to get the Variance of 4
Take the square root of the Variance to get the Standard Deviation
= 2
Answer:
#1
Step-by-step explanation:
Because To find the mean absolute deviation of the data, start by finding the mean of the data set. Find the sum of the data values, and divide the sum by the number of data values. Find the absolute value of the difference between each data value and the mean: |data value – mean|.
Answer:
m<A = 70 deg
Step-by-step explanation:
The sum of the measures of the angles of a triangle is 180 deg. Add the three measures and set equal to 180. Solve for x. then use the value of x and the expression for m<A to find the measure of angle A.
m<A + m<B + m<C = 180
5x - 25 + 2x + 10 + 3x + 5 = 180
10x - 10 = 180
10x = 190
x = 19
m<A = 5x - 25 = 5(19) - 25 = 95 - 25 = 70
Answer: m<A = 70 deg
Answer:
1408 multiply 64 by 22 for a total of 1,408
Answer:

Step-by-step explanation:
Look at the component form of each vector.
Note that vector c is <4,4> and vector d is <-2,-2>
If one imagined the line that contained each vector, the line for both would have a slope of 1, because 
Since they have the same slope they are parallel, but since they are in opposite directions, we often call them "anti-parallel" (simply meaning parallel, but in opposite directions).
If two vectors are parallel, one vector can be multiplied by a scalar to result in the other vector. This means that there is some number "k", such that
, or equivalently,
and
.
If
and
, we just need to substitute known values and solve for k:

Double checking that k works for the y-coordinates as well:

? 

So, 