Answer:
Step-by-step explanation:
0.9*2b = 1.8b
0.9*-1 = -0.9
So far we have 1.8b-0.9. It can't be simplified further.
Then, we add the 2nd part, -0.5b+1.
We have:
1.8b-0.9-0.5b+1. Next we combine like terms.
1.8b-0.5b = 1.3b.
-0.9+1 = 0.1
Then we put it together.
1.3b+0.1 is our answer.
Hope this helped! Have a nice day :D
Answer:
3/2
Step-by-step explanation:
I know this answer is correct, because I did it on edge.
Answer:
(f • g)(x) = -6x² - 24x
Step-by-step explanation:
The expression (f • g)(x) can be written in an expanded form, f(x) • g(x).
(f • g)(x) <----- Original expression
f(x) • g(x) <----- Rewritten expression
(- 6 x) • (x + 4) <----- Insert functions
-6x² - 24x <----- Multiply -6x and x, and multiply -6x and 4
Answer:
12.50 ft per hour
Step-by-step explanation:
Given that:
Fish pond has a rectangular shape.
Length of fish pond = 60 feet
Width of fish pond = 40 feet
Total time to complete the fencing = 16 hours
To find:
Unit rate of putting the fencing around the fish pond.
Solution:
First of all, we need to find the total fencing to be put around the fish pond.
Total fencing is nothing but the perimeter of the fish pond which is of rectangular shape.
Formula for perimeter of rectangular shape is given as:


Unit rate is the perimeter divided by total time taken to put the fencing around.
Therefore,
Unit rate =
feet per hour
So, the answer is <em>12.5 feet per hour</em>.