Answer:
-1
Step-by-step explanation:
4x - 4y = -10
4x - 4y + 9 = -1
1. 105
2. 210
3. 315
you just multiply
1 hour = 105
so 105*2=210
210*3=315
got it?
One worker<span> produces an average of 84 units per </span>day<span> with a street </span>What is the probability<span> that in any </span>single day worker 1 will outproduce worker 2<span>? A) 0.1141.
</span>
Answer, factory worker productivity<span> is </span>normally distributed<span>. </span>One worker produces<span> an </span>average<span> of 75 </span>units per day<span> with a standar, day with a </span>standard deviation<span> of 20. </span>Another worker produces<span> at an </span>average rate<span> of 65 </span><span>per day.
</span>
We have that
F(x)=x²<span>-10x+44
</span><span>Group
terms that contain the same variable
</span>f(x)=(x²-10x)+44
<span>Complete
the square Remember to balance the equation
</span>f(x)=(x²-10x+25-25)+44
Rewrite as perfect squares
f(x)=(x-5)²-25+44
f(x)=(x-5)²+19
this is the equation of a vertical parabola with vertex (5,19)
see the attached figure
So H + 50.16 = -200.4? I’m not sure if I’m write but I would think -250.20 would replace H.