Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
Answer:
Jade is faster than Ella by 2 minutes and 55 seconds.
Step-by-step explanation:
We are told that Ella and Jade both ran a marathon. Ella finished marathon in 4 hours 6 mins and 13 seconds. Jade finished marathon in 4 hours and 3 mins and 18 seconds.
We can write 4 hour 6 minutes 13 seconds as 4 hour 5 minutes 73 seconds. 1 minute has been borrowed to the seconds side, and seconds become 13+60 = 73 seconds.
We can see that Ella took more time than Jade. Let us find how much more time Ella took than Jade by subtracting time taken by Jade from time taken by Ella.
We can see that Jade took 2 minute and 55 seconds less than Ella , therefore, Jade was faster than Ella by 2 minutes 55 seconds.
Answer: I think y is 32 im not good at this tho
Step-by-step explanation:
Answer:
Q3: x1=2+i, x2=2-i Q4: x1=-3/2+i, x2=-3/2-i
Step-by-step explanation:

(
±
) /
= (
x1= 2+i
x2= 2-i

(
±
) /
= (-6 ±
)/4= (-3 ± i)/2
x1 = -3/2 +i
x2 = -3/2 -i