Yes you are correct
60 * 360 / 40 = 540
Total cost for tiles and paints is $924.
Step-by-step explanation:
We have been given that a community hall is in the shape of a cuboid. The hall is 40m long 15m high and 3m wide.
The paint will be required for 4 walls and ceiling.
Let us find area of walls and ceiling.
Therefore, the area of walls and ceiling is 1410 square meters.
Given: Cost for 10 litre of paint is $10 and 10 litre paint covers 25 square meter. Therefore,
Therefore, the total painting cost is $564.
Tiles will be required for floor. Let us find the area of floor.
Given: 1m squared floor tiles costs $3. So,
Therefore, the total cost for tiles is $360.
Now let us find combined total cost of tiles and paint.
Therefore, the combined total cost of tiles and paint is $924.
Answer:
$0.40 per minute
Step-by-step explanation:
You divide 6.40 by 16 to get 0.40.
To fact check this, I multiplied 0.40 by 16 and got 6.40.
Answer:
x= -5-
/4, - 5+
/4
Step-by-step explanation:
solve the equation for x by finding a,b, and c of the quadratic then applying the quadratic formula (the full thing under "answer:" is the exact answer
Answers:
11. 48%
12. 25%
13. 36%
15. 93%
16. 99%
17. 0.16%
18. 160%
19. 85%
Work for 19:
The chart is incorrect because it calculates 40% of 34 instead of 40 percent of x (we got 85% for our answer but I'm using x as the unknown number) results in the number of 34.
Percentage of 40% of what number = 34?
40% of what number = 34 is equivalent to: 40% × ? = 34
--------------------------
40% × ? = 34
? =
34 ÷ 40% =
34 ÷ (40 ÷ 100) =
(100 × 34) ÷ 40 =
3,400 ÷ 40 =
85
Proof:
If 40% × 85 = 34 =>
Divide 34 by 85...
... And see if we get as a result: 40%
----------------------------------------------------------
20. 21 students
Step-by-step explanation:
I hope I helped, and I always appreciate brainliest!!! ;)