Answer:
<u>Given :</u>
length offshore = CS=√(1+X^2)
Cable charged = 5000√(1+X^2)
onshore length = 4-X
laying cost = 3000(4-X)
total cost:
C=5000√(1+X^2) +3000(4-X)
DC/DX
= [5000*(0.5)*2X/{√(1+X^2)}]-3000=0... for optimum
5000X=3000√(1+X^2)
25X^2=3+3X^2
22X^2=3
X=√(3/22)
= 0.3693 miles
So, it would be laid offshore to S in a manner that
BS=X=0.3693 miles
Onshore=4-0.3693
=3.6307 miles
Answer: The explanation is correct.
Step-by-step explanation:
The interpretation of 95% confidence interval for population mean is that "A person can be 95% sure that the true population mean lies in it."
Given : The admissions director from Big City University found that (107.8, 116.2) is a 95% confidence interval for the mean IQ score of all freshmen.
Interpretation: The admissions director can be 95% sure that the true population mean IQ score of all freshmen lies in (107.8, 116.2).
i.e. There is a 95% probability (chance) that the interval from 107.8 to 116.2 contains μ.
Hence, the explanation is absolutely "correct" .
Answer:
6 hours of flight time I believe
Step-by-step explanation: