1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zloy xaker [14]
3 years ago
14

bills furrier marks up mink coats $3000. this represents a 50% mark up cost. what is the cost of the coats?

Mathematics
1 answer:
enyata [817]3 years ago
3 0
3000*.50=1500
1500-3000=1500
1500 is the answer
You might be interested in
{2, -1, -4, -7, ...}
lesantik [10]

Answer:

-3 every time

Step-by-step explanation:

3 0
3 years ago
If there are 206 people and 80 say no and 126 say yes how many percent say yes or no?
monitta
25.75% say no- 206/80 then * 10 (x)
74.25% say yes- 100-x
3 0
4 years ago
Read 2 more answers
Solve for u<br> 3(2u+5)=33<br> Simplify your answer as much as possible.
Pie
6u+15=33
6u=33-15
6u=18
u=3

U = 3 Is the answer!!!
HOPE THIS HELP!! :D
4 0
4 years ago
How do you find the surface area of a cylinder
Nina [5.8K]
You multiply the circumference by the diameter then you solve for the circles on the top and bottom the add them up.
BRAINLIEST PLEASE
6 0
3 years ago
Read 2 more answers
A construction company showed that the strength, y, of concrete, measured
Vilka [71]

Answer:

  a) y-intercept = 17; initial design strength percentage

  b) slope = 2.8; increase in that percentage each day

  c) 29.6 days to 100% design strength

Step-by-step explanation:

a, b) The equation is in the form called "slope-intercept form."

  y = mx + b

where the slope is m, and the y-intercept is b.

Your equation has a slope of 2.8 and a y-intercept of 17.

The y-intercept is the percentage of design strength reached 0 days after the concrete is poured. The strength of the concrete when poured is 17% of its design strength.

The slope is the percentage of design strength added each day after the concrete is poured. The concrete increases its strength by 2.8% of its design strength each day after it is poured.

__

c) To find when 100% of design strength is reached, we need to solve for x:

  100 = 2.8x +17

  83 = 2.8x

  83/2.8 = x ≈ 29.6

The concrete will reach 100 percent of its design strength in about 30 days.

8 0
3 years ago
Other questions:
  • Of the members of a student choir, 60% are boys. If there are 21 boys in the choir, how many members does the choir have in tota
    13·2 answers
  • Dvd Cases are sold in packages of 5. Padded Mailing Envelopes are sold in packets of 14. what is the last number of cases and en
    12·1 answer
  • What is 2.25x+5=13.5x+14
    12·1 answer
  • Help me plz i want help plz
    13·2 answers
  • Plastic parts produced by an injection-molding operation are checked for conformance to specifications. Each tool contains 15 ca
    8·1 answer
  • The distribution of exam scores (ranging from 0 - 100%) where the mean score is 75%, the standard deviation is 12%, and the medi
    6·1 answer
  • PLEASE HELP I POSTED LIKE 2 HOURS AGO WITH THIS QUESTION AND I NEED HELP:)
    12·2 answers
  • Write 8.87 as a mixed number and as an improper fraction.<br> Do not try to simplify your answers.
    6·2 answers
  • I WILL GIVE BRAINLIEST!! PLEASE HURRY IM TIMED.
    8·1 answer
  • In a bag of candy, there are 6 blue pieces, 14 yellow pieces, and 5 green pieces. What is the ratio of green pieces to total pie
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!