1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Savatey [412]
3 years ago
9

If ANYONE could help ASAP Pls

Mathematics
1 answer:
Goryan [66]3 years ago
7 0
ANSWER

The correct answer is C

EXPLANATION

This is the composition the two functions

We have

a(x) = 3x + 1

and

b(x) = \sqrt{x - 4}

(b \circ \: a)(x) = b(a(x))

(b \circ \: a)(x) = b(3x + 1)

We substitute to obtain,

(b \circ \: a)(x) = \sqrt{(3x + 1) - 4}

(b \circ \: a)(x) = \sqrt{3x - 3}

The domain of this function can be found by solving,

3x - 3 \geqslant 0

This implies that

3x \geqslant 3

Or

x \geqslant 1

In interval notation, we have,

[1, \infty )

The correct answer is option C
You might be interested in
How to simplify 24yz^5/32y^2z
Maurinko [17]
24y*z^5/32y^2*z

24/32 = 3/4
y/y^2 = 1/y
z^5/z = z^4/1

Soo now that they are all simplified the answer is 3z^4/4y
8 0
4 years ago
1. What is an extraneous solution of an equation?
Vadim26 [7]
“Extraneous solutions are not solutions at all. They arise from outside the problem, from the method of solution. They are extraneous because they are not solutions of the original problem. ... To tell if a "solution" is extraneous you need to go back to the original problem and check to see if it is actually a solution.”

Basically, they are an answer you get when you solve a problem, but they don’t actually make the equation true so you disregard it.
6 0
3 years ago
Two cities are building bicycle paths. Charles City has built 5km of bicycle paths by the end of the first month, and the total
sergey [27]

Answer:

Month 4

Step-by-step explanation:

To solve this problem we must propose an equation that models the number of kilometers of bicycle trails made monthly in Charles City and in Tinsel Town

<em>For Charles City </em>we know that the number of kilometers built in the first month is 5, and it doubles every month. Then we have an exponential equation, in base 2, whose initial value is 5.

This equation has the following form:

y = C_1 (2^{x-1})

Where:

C_1 is the number of kilometers built in month 1

x is the number of months: {1, 2, 3, 4, 5 ... x}

x = 1 represents month 1.

So:

Charles\ City\ (km) = 5(2^{x-1})

<em>For Tinsel Town</em> we know that the number of kilometers built in the first month is 21 and increases at a fixed rate of 5 kilometers per month. This can be modeled by a linear equation.

Tinsel\ Town\ (km) = 21 + 5(x-1)

Where x is the number of months. x: {1, 2, 3, 4, 5 ...}

We want to know at the end of what month the total length of the cycle lanes in Charles City first exceeds the length in Tinsel Town

Then we equal both equations and clear x.

5 (2^{x-1}) = 21 + 5(x-1)\\\\5 (2^{x-1}) - (21 + 5(x-1)) = 0

Clearing x from this equation is very difficult, so to find x, we iterate until we get the value of x that causes the equation to approach 0.

For x = 3

5(2^{3-1}) - (21 +5(3-1)) = 0\\\\20- 31= -11

For x = 4

5(2^{4-1}) - (21 +5(4-1)) = 0\\\\40 - 36 = 4

<em>The value must be between x = 3 and x = 4</em>

For x = 3.8

5 (2^{3.8-1}) - (21 +5(3.8-1)) = 0\\\\34.82 - 35 = 0.18

Then x ≈ 3.8 months.

Finally we have that By the end of the fourth month the total length of the cycle lanes in Charles City exceeds the length in Tinsel Town

6 0
4 years ago
Nola hiked down a trail at a steady rate for 10 minutes. Her change in elevation was -200 ft. Then she continued to hike down fo
umka21 [38]
Her first rate was faster. The 10 minutes with a change in elevation of -200ft.
In order to solve this you need to have the same minutes. In this problem, I just simply took the 10 minutes and the -200ft and doubled it. Now both rates have 20 minutes. The first rate would have gone -400ft in 20 minutes while the second rate was only -300ft in 20 minutes. I hope this wasn't confusing, and I'm willing to explain more.
7 0
4 years ago
Travis has hired Charlie and Dora to plant flowers. Dora can plant 150 flowers in the same time it takes Charlie to plant 120 fl
slega [8]

Answer:

  72

Step-by-step explanation:

If the rates d and c are flowers per day, we have ...

  150/d = 120/c

  d -c = 18

__

Multiplying the first equation by cd/30, we have ...

  5c = 4d

Multiplying the second equation by 4 gives ...

  4d -4c = 72

Adding these equations together, we get ...

  5c +4d -4c = 4d +72

Simplifying and subtracting 4d leaves ...

  c = 72

Charlie can plant 72 flowers per day.

4 0
3 years ago
Other questions:
  • Convert 3/5 into a fractions with a denominator of 20.
    7·1 answer
  • Convert 9.46×10^12 from scientific notation
    11·1 answer
  • Which best describes the relationship between the successive terms in the sequence shown? 2.4, –4.8, 9.6, –19.2
    14·1 answer
  • The lateral area of a cone is 574 cm^2. The radius is 19.6 cm. What is the slant height to the nearest tenth of a centimeter?
    9·2 answers
  • In horizontal analysis the percent change is computed by: a. Subtracting the analysis period amount from the base period amount.
    10·1 answer
  • Solve the differential equation 3ydx+(xy+5x)dy=0
    8·2 answers
  • What is the image of (0,2) after the reflection over the line y=x?
    9·2 answers
  • 1)) On an island, there are a total of 81 horses. There are 69 tame horses. How many wild horses are on the island? wild horses​
    10·2 answers
  • Please help 5 = (a - 12)/15
    9·1 answer
  • Help anyone?? Not that hardd<br> no links ! :(
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!