Answer:
10 days
Step-by-step explanation:
We are given that
Each person takes 56 days
7 painters take time=
painter days
In first 6 days , 7 painters take time=
painter days
After 6 days , 28 volunteers are added then,
Total persons=28+7=35
Now, remaining days=392-42=350
Therefore, number of days are required before the painting of the king of rock 'n' roll is completed=
days
Hence,10 more days are required before the painting of the king of rock 'n' roll is completed
<span>To write an equation in slope-intercept form, given a graph of that equation, pick two points on the line and use them to find the slope. This is the value of m in the equation. Next, find the coordinates of the y -intercept--this should be of the form (0, b) . ... Therefore, the equation for this line is y = - x + 2 .</span>
Answer:
0.966
Step-by-step explanation:
Given that:
Probability of DVD player breaking down before the warranty expires = 0.034
To find:
The probability that the player will not break down before the warranty expires = ?
Solution:
Here, The two events are:
1. The DVD player breaks down before the warranty gets expired.
2. The DVD player breaks down after the warranty gets expired
In other words, the 2nd event can be stated as:
The DVD does not break down before the warranty gets expired.
The two events here, have nothing in common i.e. they are mutually exclusive events.
So, Sum of their probabilities will be equal to 1.

C. Above the dashed line.
It becomes:
y > 1/2x +3/2
(Dashed, shaded above)
Answer:
48°
Step-by-step explanation:
m∠x plus 132° equals 180°, so x equals 180 minus 132, or 48°.