In Python, a string is an array of characters, we can access these characters using index operator []. For example, we have a_string = "Hello World" a_string[0] prints the first character in string ('H').
We can also use index operator to make substrings, for example a_string[0:3] will make a substring with first, second, third and fourth character equal to "Hell".
Now to business
my_string = "This is MY string!"
print(my_string[0:7]) # Prints "This is "
print(my_string[0:7:5]) # Prints "T" then prints the sixth character since we start counting at 0 hence prints "Ti" (note that space is also a character).
Hope this helps.
The nurek dam is 300 meters tall.
300 + 335 = 635
Hubs are very simple devices that connect network components, sending a packet of data to all other connected devices.
Hubs are relatively basic network connectors that send a packet of data to every other connected device. Compared to a hub, a switch is more intelligent and has the ability to filter and forward data to a specific location. Within various networks, switches are utilized. Nodes of the network are any computers or printers connected to it. A network workstation is a personal computer that is linked to a network (note that this is different form the usage of the term workstation as a high-end microcomputer). Nodes of the network are any computers or printers connected to it. A network workstation is a personal computer that is linked to a network.
Learn more about network here-
brainly.com/question/24279473
#SPJ4
Answer:Analog component signals are comprised of three signals, analog R′G′B′ or YPbPr. Referred to as 480i (since there are typically 480 active scan lines per frame and they are interlaced), the frame rate is usually 29.97 Hz (30/1.001) for compatibility with (M) NTSC timing.
Explanation:
Answer:
There Should be at least 10 Points
Explanation:
An execution graph becomes more powerful as you add more data points because there will be more opportunities to identify patterns. If you are looking for signs of improvement, you usually need at least 10 data points.
Performance charts (frequently acknowledged as line graphs outside the excellence management field) display the performance of the process over time