Answer:
Samantha's grade was 1.29 standard deviations above the class mean, that is, she scored better than 0.9015 = 90.15% of the class.
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
In this question:
She scored better a proportion of the class given by the p-value of z = 1.29
z = 1.29 has a p-value of 0.9015.
Samantha's grade was 1.29 standard deviations above the class mean, that is, she scored better than 0.9015 = 90.15% of the class.
Answer:
C
Step-by-step explanation:
The equation of C is 4th-degree, so is definitely non-linear.
___
The equation of E can be multiplied by y to get x +y = 2y, which is a linear equation. It graphs as a straight line, so can be called linear on that basis. However, it has a "hole" at y=0, so could arguably be called non-linear.
Answer:
8 would be there.
Step-by-step explanation:
am sorry i cant explain cause my battery is really low
Answer:
ok
Step-by-step explanation:
Answer:
B.
Step-by-step explanation:
It only has one base and it's a pentagon. Therefore, it's a pentagonal pyramid.