Answer:
B)many people become entrepreneurs because they do not enjoy working for someone else.
Explanation:
The examination of the reasons provided by the people who wants to accept the entrepreneurship risk as here most of the people become entrepreneurs but at the same time they dont enjoy working for someone else as they wabt to work for themselves not for someone else
Therefore as per the given situation, the option b is correct
Answer:
The numbers are missing, so I looked for a similar question (see attached image).
- the expected value for option A (modernize everything) = (0.5 x $90,000) + (0.5 x $25,000) = $57,500
- the expected value for option B (modernize only second floor) = (0.4 x $80,000) + (0.6 x $70,000) = $74,000
- the expected value for option C (do nothing) = (0.3 x $60,000) + (0.7 x $33,000) = $41,100
The option with the highest expected value is option B (modernize only second floor).
Answer:
The value of the intangible will remain at $350,000
Explanation:
The reason is that the International Accounting Standard IAS-36 says that once the impairment is recognized for the intangible assets it can not be reversed which means that the amount reported would be $350,000. The reason is that it is very rare that the asset gain its value and specially those which are intangible assets. Most of the management in the 1990s-2000 tried to recognize a gain on impairment which was unjustifiable to increase their profits for the period so the standard specifically didn't permitted gain on a previously impaired asset.
Answer:
y
Explanation:
hhahahhababa abahajanhajshs
Answer:
$102.3 per machine hour
Explanation:
We can compute the total production engineering cost per hour by using the following equation;
Cost per machine hour = (Fixed cost + Variable cost) / Total machine hours
But first, we need to calculate variable cost at 9,600 hours;
= $766,320 × 9,600hr / 9,300hr
= $791,040
Now, cost per machine hour
= $191,040 + $791,040 / 9,600hr
= $982,040 / 9,600hr
= $102.3 per machine hour