Answer: C.36
Step-by-step explanation:
Answer:
B
Step-by-step explanation:
Total mold spores at end of 9.30 am is 26901.
Step-by-step explanation:
Number of molds = 14000
Rate = 9.7% per hour
Number of hours = 12 am to 9.30 am = 9
hours
Growth of mold = 14000 * 9.7% * 9
= 12901
Total mold spores at end of 9.30 am = 14000 + 12901
= 26901
Hence, the expected number of mold spores at 9.30 am is 26901.
The simplified version of this x-2z
Step-by-step explanation:
You need to start by combining like terms. You can start with the terms that have the variable x in them. By combining those terms, the equation becomes x+3y-z-3y-z.
From here, you can combine the terms 3y and -3y, which bring the equation to x-z-z.
From here, combine the terms with the variable z. This would bring the equation down too x-2z, your final answer.
Answer:
confidence interval:
This tells us the degree of certainty or uncertainty that is existent in a sampling method. It gives us a range of values, telling us we are fairly sure that our true value or parameter lies within the range.
Degree of confidence:
This tells us that the confidence interval has captured the true/exact population parameter.
If we have 95% degree of confidence, we are 95% sure that that the exact/true parameter are in the confidence interval