Answer:
1/6
Step-by-step explanation:
-3/4 - (-1/2) = - 1/4
-2/3 - 5/6 = - 3/2
-1/4 ÷ -3/2
Μ = (0×0.026) + (1×0.072) +(2×0.152) + (3×0.303) + (4×0.215) + (5×0.164) + (6×0.066)
μ = 0 + 0.072 + 0.304 + 0.909 + 0.86 + 0.82 + 0.396
μ = 3.361 ≈ 3.4
We need the value of ∑X² to work out the variance
∑X² = (0²×0.026) + (1²×0.072) + (2²×0.152) + (3²×0.303) + (4²×0.215) + (5²×0.164) + (6²×0.066)
∑X² = 0+0.072+0.608+2.727+3.44+4.1+2.376
∑X² = 13.323
Variance = ∑X² - μ²
Variance = 13.323 - (3.4)² = 1.763 ≈ 2
Standard Deviation = √Variance = √1.8 = 1.3416... ≈ 1.4
The correct answer related to the value of mean and standard deviation is the option D
<span>
An employee works an average of 3.4 overtime hours per week with a standard deviation of approximately 1.4 hours.</span>
Step 1: -3(x+2y=3)
Step 2: -3x-6y=-9
Step 3: 3x cancels out with -3x
Step 4: add 2y and -2y, and add 3 and 5
Step 5: the answer is NO SOLUTION or INFINITE SOLUTION