If you have purchased a printer that has the capability to print in duplex mode so that users can print on both sides of a sheet of paper. However, when users try to use this capability when they send a print job, documents are still printed on only one side. Then there might be a problem with (d) THE DUPLEX MODE NEEDS TO BE ENABLED ON THE DEVICE SETTINGS TAB IN THE PRINTER'S PROPERTIES.
Explanation:
- If the duplex mode isn't enable on the printer setting, then the printer is still going to read that the output should come in a single page and not in the duplex mode.
- When facing such a problem, the user should go to the "Device Settings" tab in the printer properties and change the required settings to print according to the users needs.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer:
The answer to this question is given below in the explanation section.
Explanation:
This program is written in C++.
#include <iostream>
using namespace std;
int main()
{
string word;// variable for taking user input
int cond;// to set condition true if user preses the stop and exit from loop
cout<<"Enter word: \n";
cin>>word;
do// start while loop
{
if(word=="stop" || word =="STOP" || word == "Stop")// if user enter word stop, then program exit
{
cond=0;
}
else//otherwise loop continue
{
cout<<" You Entered "+ word +"\n";
cout<<"Enter word: \n";
cin>>word;
cond=1;
}
}
while(cond == 1);// if user don't enter word "stop" loop run continuesly.
cout<<"Program exit";
return 0;
}
That is an interactive question.