Answer:
A.
Explanation:
A well designed high-volume system will minimize work-in-process (WIP) inventory and reduce lead time for the product.
Work in process (WIP) are partially finished products. WIP inventory could be minimized by designing a suitable high-volume system.
Lead time or throughput time is the time taken for a product to be manufactured or processed. A well designed high-volume system would reduce throughput time.
Answer:
A visual representation of colors arranged according to their hues, or the chromatic relation they share
Explanation:
And? Please give me an explanation.