1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ladessa [460]
4 years ago
8

Which is the graph of the system of equations? x + 2y = 2 4x - y = 4

Mathematics
1 answer:
Sladkaya [172]4 years ago
4 0
Solve for x for x: x+2y=2
x+2y +-2y=2+-2y (add -2y on both sides.)
x=-2y+2
Substitute : -2y+2 for x in
4x-y=4:
4(-2y+2)-y=4
-9y+8=4 Simplify both sides of the equation.
-9y+8+-8=4+-8 Add -8 to both sides.
-9y=-4
-9/-9=-4-9 Divide both sides by -9
y=4/9
Substitute 4/9 for y in
x=-2y+2
x=-2(4/9)+2
x=10/9
y=4/9,x=10/9




You might be interested in
Determine the value of r so that a line through the points (r,3) and (5,-4) has a slope of -1/2
CaHeK987 [17]

\bf (\stackrel{x_1}{r}~,~\stackrel{y_1}{3})\qquad (\stackrel{x_2}{5}~,~\stackrel{y_2}{-4}) \\\\\\ slope = m\implies \cfrac{\stackrel{rise}{ y_2- y_1}}{\stackrel{run}{ x_2- x_1}}\implies \cfrac{-4-3}{5-r}=\stackrel{\stackrel{slope}{\downarrow }}{-\cfrac{1}{2}}\implies \cfrac{-7}{5-r}=\cfrac{1}{-2} \\\\\\ 14=5-r\implies 9=r

.

3 0
3 years ago
Susan is 60 inches tall. Myra is 6 inches taller than Elaine, who is 4 inches shorter than susan how tall is myra
LenKa [72]

62 inchezzzzzzz so 60-4 = 56 --- 56 +6 = 62

5 0
3 years ago
Lisa takes 3 hours to mow the lawn, while her cousin, Barb, takes 2 hours. How long will it take them working together?
Colt1911 [192]

Answer:6 hours

Step-by-step explanation:

3x2=6

5 0
3 years ago
Read 2 more answers
John can clear a lot in 1.5 hours. His partner can do the same job in 4.5 hours. How long will it take them to clear the lot wor
Crank

Answer:

1 hour and 7.5 minutes

Step-by-step explanation:

We have the following information:

Jose makes 1 / 1.5 of the job per hour. It is his rate of work in addition to that the partner makes 1 / 4.5 of the job per hour. It is his rate of work.

Thus:

1 / 1.5 + 1 / 4.5 = 1 / x

0.8898 = 1 / x

x = 1 / 0.8888

x = 1.125

Hence, it will take 1 hour and 7.5 minutes for them to complete the job working together.

4 0
3 years ago
How many times does 0.6 go into 12.66?<br> first brainlyist
aleksklad [387]

Answer:

.6 goes into 12.66 21.1 times

8 0
3 years ago
Other questions:
  • salt water has a density of 1030 kg/m^3. a piece of wood with mass of 1260 g is a cuboid with dimensions 7 cm x 10 cm x 15 cm.Wi
    12·1 answer
  • If point c divides line ab in the ratio 2 : 3, the coordinates of C are. If point D divers linebackers in the ratio 3 : 2, the c
    5·1 answer
  • Need help smart people
    12·1 answer
  • How do you solve 5x - 10 = 3x
    13·1 answer
  • Tonya pays 300$ Each month to rent an office where she earns 25$ an per hour tutoring students. Which equation represents Tonyas
    10·1 answer
  • Help please? ASAP!!!!
    6·1 answer
  • Being 250 meters apart, two puppies started running towards each other at the same time. The first puppy ran 1.5 meter per secon
    15·1 answer
  • Match the GCF with the factors.
    6·1 answer
  • PLEASE HELP!!<br> You need to factor by grouping.<br> Please explain the steps!
    14·1 answer
  • Find the time it takes an object to hit the ground when it is dropped from:
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!