Eric need 5 batches of paving stones to created his patio.
Answer:
the answer is 2>am sorry if wrong
Answer:
Step-by-step explanation:
AB is a midsegment.
<u>Property of the midsegment is midsegment is half the length of the parallel side of the triangle:</u>
<u>And</u>
7^50
= 1.798 × 10^42
i am a mathematics teacher. if anything to ask please pm me
So j completed 6/7 of a lap
gabe has completed 2/9 lap
so
1 j lap=7 mins s o
7j
j=num of laps
1 g lap=9 mins so
9g
g=num of laps
then 6+j
and g+2
so
when will the times be equal
7j+6=9g+2
subtract 2 from both sides
7j+4=9g
divide both sides by 9
7/9j+4/9=g
so to get a whole number of laps, we must subsitute a number when it is multiplied by 7 then add 4, we get a multiplue of 9
so if j=2
7/9(2)+4/9=g=14/9+4/9=g=18/9=g=2
so josh and gabe must run 2 lap each because
6+(2 times 7)=2+(9 times 2)
6+14=2+18
20=20
true so
the answer is 2 laps