1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
frez [133]
3 years ago
7

Plz plz help me plz help plz plzplzplz help me plz plz plzplzplzplz

Mathematics
2 answers:
asambeis [7]3 years ago
5 0

Answer:

Step-by-step explanation:

Whats the activity?

zubka84 [21]3 years ago
3 0

Answer:

What’s the activity? Need more information.

Step-by-step explanation:

You might be interested in
How do i write an equation in vertex form?
Arte-miy333 [17]

Answer:

Step-by-step explanation:

1) Vertex form of a quadratic equation is y=a(x-h)2+k, where (h,k) is the vertex of the parabola.

2) The vertex of a parabola is the point at the top or bottom of the parabola.

3) 'h' is -6, the first coordinate in the vertex.

4) 'k' is -4, the second coordinate in the vertex.

5) 'x' is -2, the first coordinate in the other point.

8 0
3 years ago
Determine if the graph of y=x/x^2-4 is symmetrical with respect to the x-axis, the y-axis, or the origin.
aalyn [17]

9514 1404 393

Answer:

  c.  about the origin

Step-by-step explanation:

The function is odd: replacing x with -x gives the negative of the function value:

  f(-x) = -f(x)

Odd functions are symmetrical about the origin.

3 0
3 years ago
What is 2 7/8 as an integer
snow_lady [41]

2 7/8 is not an integer value, so cannot be expressed as an integer.

It can be rounded to the nearest integer, 3.

4 0
3 years ago
The sum of the measures of two exterior angles of a triangle is 255°. What is the measure of the third exterior angle?
Juliette [100K]
Answer its b hope is helps 

5 0
3 years ago
a company that manufactures bicycles has a fixed cost of $80,000. it costs $100 to produce each bicycle. the total cost for the
frez [133]

C(x) = 80000 + 100x is the total cost as function of number of cycles produced

C(90) = 89000 and it costs $ 89000 to produce 90 bicycles

<em><u>Solution:</u></em>

Given that, company that manufactures bicycles has a fixed cost of $80,000

Fixed cost = $ 80,000

Let x be the number of cycles produced

Let C(x) be the total cost as function of number of cycles produced

It costs $100 to produce each bicycle

Variable cost = 100 x number of cycles produced

variable cost = 100x

The total cost for the company is the sum of its fixed cost and variable costs

total cost = fixed cost + variable cost

C(x) = 80000 + 100x

Thus total cost as function of "x" is found

<em><u>Find and interpret C(90)</u></em>

Substitute x = 90 in C(x)

C(90) = 80000 + 100(90)

C(90) = 80000 + 9000

C(90) = 89000

Thus it costs $ 89000 to produce 90 bicycles

3 0
3 years ago
Other questions:
  • 3(x+1) = -2(x-1)+6 solve for x
    15·1 answer
  • 100 POINTS PLEASE HELP ASAP
    6·2 answers
  • What is the sum of the infinite geometric series 9−6+4−83+...9-6+4-83+...??
    5·1 answer
  • Fahrenheit femperature can be obtained from Celsius (centigrade) temperature by multiplying by 1and adding 32 degrees What Fahre
    14·1 answer
  • What does it mean to write the trinomial as the product of two factors? I’m dumb lol
    15·1 answer
  • How do you find the sum of the first 25 terms in a sequence?
    5·2 answers
  • Andre and han are moving boxes. Andre can move 4 boxes every half hour. Han can move 5 boxes every half hour. How long will it t
    14·1 answer
  • Sarah thinks that the
    11·2 answers
  • The duration of a movie is 3 hours and 15 minutes if it starts at 6:30pm at what time will it end?​
    6·1 answer
  • System of equations, please help.
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!