1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
daser333 [38]
3 years ago
14

Software built and delivered in pieces is known as

Computers and Technology
2 answers:
mafiozo [28]3 years ago
8 0

Answer:

Incremental technique is the way in which software is built and delivered in pieces. The concept is to keep the client and developer on same page and the client is known as a non tech person, so he should be given software in piece by piece to avoid any confusion and sudden change.

Agile method is the best example of this technique in which steps are defined on contract basis and the software is delivered and build by pieces to keep client and developer on same page.

Arturiano [62]3 years ago
6 0

Software built and delivered in pieces is known as an \fbox{\begin \\\text{incremental process}\\\end{minispace}}.

Further Explanation:

Working of Incremental process:

The incremental process is a technique of software development in which software is built and delivered in pieces. In incremental process both development and maintenance process are done. The product is defined as finished when it satisfies all of its requirements.  

Incremental process model joins the characteristics of the waterfall model with the iterative philosophy of prototyping.

The product is broken into a number of components, each of which are designed and built individually. Each element is delivered to the client when it is complete. This allows partial usage of product and avoids a <u>long development time</u>. It also generates a large initial capital outlay with the subsequent long wait avoided. This model of development also helps ease the traumatic effect of introducing completely new system all at once.

The incremental life cycle is attached below.

Advantages of Incremental process:

  1. Easy to test and debug during a small iteration.
  2. Cost is less and more flexible.
  3. Easy to manage risk.
  4. Customer can respond to each build in this model.

Disadvantages of Incremental process:

  1. Need good planning and design.
  2. Total cost is higher than waterfall model.
  3. Requires clear and complete information about the system.

Learn more:

  1. A company that allows you to license software monthly to use online is an example of. brainly.com/question/10410011  

Answer details:

Grade: Senior school

Subject: Computer Science

Chapter: Software Testing

Keywords:

software, hardware, system, planning, design, traumatic, incremental,components, developments, waterfall model, prototype,spin , iterative, testing.

You might be interested in
If you want a language that is relatively easy to write and which can be tested easily as it's being developed, you would choose
Oksi-84 [34.3K]

Answer:

true

Explanation:

because it needs a interpreter so that it could be more developed

3 0
3 years ago
John has had a message pop-up on his computer asking him to pay $800 to have his files
faltersainse [42]

• Installed a program containing ransomware/malware. (Do not accept downloaded without inferring it was installed)

• Opened an email attachment containing malware.

• Opened a file containing a malicious macro.

• Left his computer unsecure allowing someone else to install malware on it. (Should include an example, e.g. not logging off)

3 0
3 years ago
Read 2 more answers
En un taller tienen dos taladros de sobremesa de 600 w de potencia, una sierra de calar de 500 w y cuatro soldadores de 50 w. Lo
sveticcg [70]

Answer:

El consumo del taller es de 3.7 kw/h.

Explanation:

Dado que el taller posee dos taladros de sobremesa de 600 vatios de potencia, que son utilizados durante 2 horas diarias; una sierra de calar de 500 vatios de potencia que es utilizada durante 1 hora diaria, y cuatro soldadores de 50 vatios que se utilizan durante 4 horas diarias, para medir el consumo diario de energía del taller es necesario realizar el siguiente calculo:

600 x 2 x 2 = 2,400 vatios de consumo taladros

500 x 1 x 1 = 500 vatios de consumo sierra de calar

50 x 4 x 4 = 800 vatios de consumo soldadores

2,400 + 500 + 800 = 3,700 vatios de consumo total

Pasado a kilovatios, el consumo del taller es de 3.7 kw/h.

4 0
2 years ago
What is 11.2 rounded to the nearest one?​
klio [65]
Your answer is already in one decimal place. If you consider the whole number to one decimal place it would be rounded to just 10 since 0 doesn’t count for sig figs. Hope it helped
4 0
3 years ago
Read 2 more answers
What does OSS mean? ??
Viefleur [7K]
Ooeration support system. OSS is IT for running a communications network.
6 0
3 years ago
Other questions:
  • A password checking system that disallows user passwords that are proper names or words that are normally included in a dictiona
    15·1 answer
  • What is the final step used when designing an algorithm?
    14·1 answer
  • The java compiler requires that a source file use the ________ filename extension question 3 options: 1) .class 2) .h 3) .java
    8·1 answer
  • What is out put.what is data. what is microprocessor
    14·1 answer
  • Why is it hard for some people to keep a promise even one that they make to themselves​
    10·2 answers
  • Write an algorithm to sum to values
    11·1 answer
  • TOT al<br>Name TWO examples of these settings and utilities. (2)​
    12·1 answer
  • Please help! I need to submit this quick!
    6·2 answers
  • A while loop uses a(n) ___________ at the top of every iteration to test whether to continue or not.
    13·1 answer
  • Gaining information by tricking an individual into releasing information is often referred to as.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!