Distrivute 0.2 to x and +50 and you get 0.2x+10-6 now for the other side we do the same and we get 1.2x+8 or an easier way... Let's solve your equation step-by-step.<span><span><span>0.2<span>(<span>x+50</span>)</span></span>−6</span>=<span>0.4<span>(<span><span>3x</span>+20</span>)</span></span></span>Step 1: Simplify both sides of the equation.<span><span><span>0.2x</span>+4</span>=<span><span>1.2x</span>+8</span></span>Step 2: Subtract 1.2x from both sides.<span><span><span><span>0.2x</span>+4</span>−<span>1.2x</span></span>=<span><span><span>1.2x</span>+8</span>−<span>1.2x</span></span></span><span><span><span>−x</span>+4</span>=8</span>Step 3: Subtract 4 from both sides.<span><span><span><span>−x</span>+4</span>−4</span>=<span>8−4 </span></span><span><span>−x</span>=<span>4 now you divide by negative x (technically it is -1x=4 so your answer is x=-4</span></span>
The square it’s self without the side triangles is 132ft^2 and the triangles them selves are 18ft^2.
Since there are 2 triangles both combined would be a total of 36ft^2
The total area of the square is 132ft^2
Total area of one triangle is 18ft^2
Total area is 168ft^2
Side length dimensions:
Square without sides: 12x11 ft
Each triangle: 1/2 12x3
Problem 13
10p+10q factors to 10(p+q). If we apply the distributive property, we can distribute the 10 to each term inside (p and q) to get
10(p+q) = (10 times p)+(10 times q) = 10*p + 10*q = 10p+10q
so we get the original expression again. Here 10 is the GCF of the two terms.
--------------------------------------------------------------
Plug p = 1 and q = 2 into the factored form
10*(p+q) = 10*(1+2) = 10*(3) = 30
As a check, let's plug those p,q values into the original expression
10*p+10*q = 10*1+10*2 = 10+20 = 30
We get the same output of 30
Answer:
D
Step-by-step explanation:
Answer:
3.6 hours
Step-by-step explanation:
Blake can do work in hours = 9
Blake can do a part of work in 1 hour = 
Ned can paint the same room in six hours.
Ned can do a part of work in 1 hour = 
They can do a part of work together in 1 hour = 
=
Now they can do
part of work in hour = 1
So, they can do whole work in hours = 
= 
Hence it will take 3.6 hours to paint the room if they work together.