1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
mel-nik [20]
4 years ago
10

Evaluate -3.28 - (-4.4) + (-p) where p = 9.7.

Mathematics
2 answers:
ValentinkaMS [17]4 years ago
3 0

Answer:

-8.58

Step-by-step explanation:

you take -3.28 and add it to 4.4 (because that double negative cancels out) and then take that (1.12) and subtract 9.7 from that and you get -8.58

Mama L [17]4 years ago
3 0
-3.28 -(-4.4)+(-9.7)= -8.58
You might be interested in
There is 60% chance of making $12,000, 10% chance of breaking even and 30% chance of losing $6,200. What is the expected value o
oksano4ka [1.4K]

Answer:

$5,340

Step-by-step explanation:

Given :

Making a probability distribution :

X : ___12000 ____0 _____-6200

P(X) __ 0.6 _____ 0.1 _____ 0.3

Tge expected value of the purchase si equal to the expected value or average, E(X) :

E(X) = ΣX*p(X)

E(X) = (12000 * 0.6) + (0 * 0.1) + (-6200 * 0.3)

E(X) = 7200 + 0 - 1860

E(X) = $5,340

4 0
4 years ago
What is the arc length of the subtending arc for an angle of 72 degrees on a circle of radius 4?
shepuryov [24]
First, determine the circumference (C) of the circle, the equation,
                                           C = 2πr
Substituting the value or the radius,
                                    C = 2π ( 4) = 8π
The arc length is the product of the circumference and the ratio between the subtended angle and 360. The mathematical expression is already,
                              S = (8π) x (72 / 360) = 0.8π 
Thus, the arc is 0.80π. 
3 0
3 years ago
Y=6(x-7)(x+2) standard form
STALIN [3.7K]

Answer:

y=6x^2-30x-84

Step-by-step explanation:

3 0
3 years ago
Help meh plz I just need answer question in pic
Yanka [14]

Answer:

A

Step-by-step explanation:

At the vertex, the quadratic term in this notation must be zero, i.e., the (x-1)  part. This happens for x=1. So you can already rule out answers C and D.

Now fill in x=-2 in both remaining answers and see what happens.

For A: y = -2(-2 - 1)² + 3 = -15

For B: y = (-2 - 1)² + 3 = 12

That eliminates B and leaves A.

4 0
3 years ago
100 POINTS Motorola used the normal distribution to determine the probability of defects and the number of defects expected in a
kvv77 [185]

1. a) 0.3174 = 31.74% probability of a defect

1. b) The expected number of defects for a 1,000-unit production run is of 317.

2. a) 0.0026 = 0.26% probability of a defect

2. b) The expected number of defects for a 1,000-unit production run is of 3.

Step-by-step explanation:

When the distribution is normal, we use the z-score formula.

In a set with mean  and standard deviation , the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

Question 1:

We have that:

a. Calculate the probability of a defect.

Less than 9.88 or greater than 10.12. These probabilities are equal, so we find one and multiply by 2.

Probability of less than 9.88:

This is the pvalue of Z when X = 9.88. So

has a pvalue of 0.1587

2*0.1587 = 0.3174

0.3174 = 31.74% probability of a defect

b. Calculate the expected number of defects for a 1,000-unit production run.

The expected number of defects is 31.74% of 1000. So

0.3174*1000 = 317.4

Rounding to the nearest integer

The expected number of defects for a 1,000-unit production run is of 317.

Question 2:

The mean remains the same, but the standard deviation is now

a. Calculate the probability of a defect.

Less than 9.88 or greater than 10.12. These probabilities are equal, so we find one and multiply by 2.

Probability of less than 9.88:

This is the pvalue of Z when X = 9.88. So

has a pvalue of 0.0013

2*0.0013 = 0.0026

0.0026 = 0.26% probability of a defect

b. Calculate the expected number of defects for a 1,000-unit production run.

The expected number of defects is 31.74% of 1000. So

0.0026*1000 = 2.6

Rounding to the nearest integer

The expected number of defects for a 1,000-unit production run is of 3.

7 0
3 years ago
Other questions:
  • Math question please show work for brainliest :)
    5·2 answers
  • 0.025 0.25 0.205 0.052 order smallest to biggest
    12·1 answer
  • Find three consecutive odd integers such that the sum of the largest and twice the smallest is 25.
    7·1 answer
  • Mode of 68 66 76 66 69
    14·1 answer
  • the points on the number line show how many pennies for children have how many more money does the child with the most pennies h
    12·1 answer
  • F(x)=3x+6<br><br> Evaluate for f(4)<br><br><br> Need Answers ASAP
    12·2 answers
  • Write the ratio as a fraction in simplest form.<br><br><br> 28 players to 8 teams
    12·1 answer
  • HELP! PLEASEE I’ve been stuck!! I WILL GIVE BRAINLY,,, THANK YOU SM
    12·2 answers
  • Simplify.<br> 2x (3 – 1) + 3
    13·2 answers
  • A bag contains 4 white beads, 6 red beads, and 5 yellow beads. One bead is selected and not replaced. Then another bead is selec
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!