Answer:
a.P<x<9.85 orx>10.15)=0.3174, Total defects=317.4
b.p=0.0026,total defects=2.6
c.Less of the items produced will be classified as defects.
Step-by-step explanation:
a.The standard score,z, is esentially x reduced by process mean then divided my process standard deviation.

Total defects=Production*Probability
=0.3174*1000

b. 
therefore:-

Defects=Probability*Production
=0.0026*1000
=2.6
c.Reducing process variation results in a significant reduction in the number of unit defects.
Answer:
D) g(x) = 2x-8
Step-by-step explanation:
Answer:
x=3
Step-by-step explanation:
first let's try to get just 3x on one side. to do this we can subtract 2 from both side of the equation.
3x+(2-2)=11-2
3x=9
now we have to isolate the variable we can divide both sides by 3:
3x/3=9/3
x=3
and you get the answer that x is 3
(-5,-1) would be the coordinates since the only thing we’re changing by moving west is that we’re subtracting from the x value. Therefore, 2-7 is -5 so we get -5,-1