Answer:
First question: LCL = 522, UCL = 1000.5
Second question: A sample size no smaller than 418 is needed.
Step-by-step explanation:
First question:
Lower bound:
0.36 of 1450. So
0.36*1450 = 522
Upper bound:
0.69 of 1450. So
0.69*1450 = 1000.5
LCL = 522, UCL = 1000.5
Second question:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
The margin of error is:

The project manager believes that p will turn out to be approximately 0.11.
This means that 
95% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
The project manager wants to estimate the proportion to within 0.03
This means that the sample size needed is given by n, and n is found when M = 0.03. So






Rounding up
A sample size no smaller than 418 is needed.
Answer:
9
Step-by-step explanation:
k=-9
-9×-9
81 square rooted
9
You idiot you answered your own question!
Answer:
3) 12 yd^2
4) 27.5 m^2
5) 48 ft^2
6) 96 m^2
Step-by-step explanation:
3) 4(2x3x0.5) = 12 yd^2
4) (9x5)-(0.5)(7x5) = 27.5 m^2
5) (10x6)-(6x2) = 48 ft^2
6) 12x8 = 96 m^2
Answer:
7 hours
Step-by-step explanation:
9 : 30 to 17:00 = 7 hours 30 minutes
Minus 30 minutes = 7 hours