Answer:
half a person's box says -8. the other half says 5. under the box says to add both numbers,divide by 12 , then multiply by 0
Explanation:
solve : -8 +5 = -3.
-3/12= -0.25
-0.25 *0 = 0
Answer: variable portion of the predetermined overhead rate.
Explanation: When computing variable manufacturing overhead variances, the standard rate represents the VARIABLE PROPORTION OF THE predetermined overhead rate. variable portion of the predetermined overhead rate. standard hourly pay rate for direct laborers. the amount of hours allowed for the actual output.
I think that due to the number of casualties on both sides neither side was a clear winner
C. Deposits fertile soil after floods.