1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alexandra [31]
3 years ago
9

A system consists of two components C1 and C2, each of which must be operative in order for the overall system to function. Let

W1 and W2 be the events that components C1 and C2 work without failure for one day. The probabilities P(W1) and P(W2) are called the reliabilities of components C1 and C2. The probability P(W1W2) is called the reliability of the whole system. If P(W1) = 0.9 and P(W2) = 0.8, calculate the reliability of each system. Which of the systems has greater reliability. Attach a file with your solution approach.

Mathematics
1 answer:
hram777 [196]3 years ago
8 0

Answer:

The reliability of the first system to work is 0.72 whereas the reliability of the second system to work is 0.98.As the reliability of the second system is more than the first one so the second system is more reliable.

Step-by-step explanation:

For first system as given in the attached diagram gives,

P(W_1W_2)=P(W_1) \times P(W_2)

As the systems are independent.

The given data indicates that

  • P(W_1) is given as 0.9
  • P(W_2) is given as 0.8

Now the probability of the system is given as

P(W_1W_2)=P(W_1) \times P(W_2)\\P(W_1W_2)=0.9 \times 0.8\\P(W_1W_2)=0.72

So the reliability of the first system to work is 0.72.

For the second system is given as

P(W_1W_2)=1-P(W_1'W_2')

Where

  • P(W_1'W_2') is the probability where both of the systems does not work. this is calculated as

P(W_1'W_2')=P(W_1') \times P(W_2')\\P(W_1'W_2')=(1-P(W_1)) \times (1-P(W_2))\\P(W_1'W_2')=(1-0.9) \times (1-0.8)\\P(W_1'W_2')=(0.1) \times (0.2)\\P(W_1'W_2')=0.02

So now the probability of the second system is given as

P(W_1W_2)=1-P(W_1'W_2')\\P(W_1W_2)=1-0.02\\P(W_1W_2)=0.98

So the reliability of the second system to work is 0.98.

As the reliability of the second system is more than the first one so the second system is more reliable.

You might be interested in
Blank percent of 50 shirts is 35 shirts
kirill [66]

x\% \times 50 = 35 \\  \dfrac{x}{100}  \times 50 = 35 \\ x = 35 \div 50 \times 100 \\ x = 70

Answer check :
50 \times  \dfrac{70}{100}  \\  = 35

Answer : 70%

Hope this helps. - M
4 0
3 years ago
Find the solution to the following system of equations by using Substitution. To receive full credit, substitution must be used
Sever21 [200]

Answer:

see the attached picture.

3 0
3 years ago
The theater's income in dollars are sold is(20x18)x5.use properties to find the total income.what property is (20x18)x5. the pro
Pie
Associative Property of Addition
4 0
3 years ago
Write -12 in the improper fraction form.
nydimaria [60]

Answer:

\frac{-12}{1}

Step-by-step explanation:

An Improper Fraction has a top number larger than (or equal to) the bottom number.

To convert a whole number -12 into an improper fraction we can divide the whole number by one to turn it into a temporary fraction.

\frac{-12}{1}

Also we could multiply and divide -12 by another number greater than one, for example:

\frac{-12*2}{1*2} = \frac{-24}{2}

There are several ways we can write -12 in the improper fraction form.

6 0
3 years ago
When five is added to three more than a certain the result is 19 what is the number?
gulaghasi [49]

Answer: It should be 11

Step-by-step explanation:

11 + 3 = 14 14 is three more than 11 and when you add 5 you get 19

8 0
3 years ago
Other questions:
  • I will reward brainliest
    10·2 answers
  • HELP please only have a couple of minutes.
    6·1 answer
  • Perform the indicated operation. 15 - (-11) 4 -4 26 -26
    10·2 answers
  • In a process that manufactures bearings, 90% of the bearings meet a thickness specification. A shipment contains 500 bearings. A
    10·1 answer
  • Can someone answer this question quickly? thanks
    12·1 answer
  • a bank manager wants to know the mean amount of mortgage paid per month by homeowners in an area. a random sample of 120 homeown
    12·1 answer
  • A chef planning for a large banquet , thinks that 2 out of every 5 dinner guests will order his soup appetizer. He expects 800 g
    13·1 answer
  • 4. To draw graph of 4x+ 5y = 19, Find y<br>when a=1<br>(A) 4<br>(B 3<br>62<br>D2-3​
    12·1 answer
  • Help ASAP PLEASEEEE help help
    8·1 answer
  • If my dot plot is not skewed or symmetrical which measure of variability should I use? (15 data points) please help asap! :)
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!