First we will find the interest on:
P = $235 principal
t = 2 years
r = 0.1415 annual rate
A = future value
I = A - P the interest
A = P(1 + r)^t
A = 235(1 + 0.1415)^2
A = $306.21
I = A - P
I = $306.21 - $235
I = $71.21
the interest was $71.21.
Next lets find the lifetime cost value:
Lifetime cost value = 306.21 + 5*1.56*52 + 5*0.78*52 = $914.61 (considering that 1 year = 52 weeks)
Now lets find the percentage what percentage the interest is of the lifetime cost:
(71.21/914.61)*100 = 7.79%
<span>← Previous Problem<span>Next Problem →</span></span>
Answer:
y - 7 = - 1(x - 4)
Step-by-step explanation:
The equation of a line in point- slope form is
y - b = m(x - a)
where m is the slope and (a, b) a point on the line
Here m = - 1 and (a, b) = (4, 7) , thus
y - 7 = - (x - 4)
Answer:
Step-by-step explanation:
lower left triangle: 5^2 + x^2 = 13^2
x^2 = 144 => x = 12
So, area of triangle is : (5 * (12-4))*0.5 => 20
Shaded area: (8 *12) -20 => 96 -20
=76 unit^2
Answer:
She needs a time of 61 min on her 8th ride
in order to average 51 min for the 8 rides
Step-by-step explanation:
+%28+46+%2B+48+%2B+50+%2B+43+%2B+54+%2B+54+%2B+52+%2B+t+%29+%2F+8+=+51+
+347+%2B+t+%29+%2F+8+=+51+
+347+%2B+t+=+408+
+t+=+61+
Answer:
m = 6
Step-by-step explanation:
5.75 x 6 = 34.5
329 + 34.5 = 363.50