Answer:
it's 512
Step-by-step explanation:
See attachment for math work and answer.
f(5) is -1
Step-by-step explanation:
- Step 1: Given f(x) = -2x + 9, find f(5)
f(5) = -2 × 5 + 9 = -10 + 9 = -1
Answer:
2580 ft-lb
Step-by-step explanation:
Water leaks out of the bucket at a rate of
Work done required to pull the bucket to the top of the well is given by integral
Here, function
is the total weight of the bucket and water
feet above the bottom of the well. That is,
is the initial height and
is the maximum height of well. That is,
Find the work done as,


![&\left.=46x-0.05 x^{2}\right]_{0}^{60}](https://tex.z-dn.net/?f=%26%5Cleft.%3D46x-0.05%20x%5E%7B2%7D%5Cright%5D_%7B0%7D%5E%7B60%7D)


Hence, the work done required to pull the bucket to the top of the well is 
Answer:
200 students attended the basketball game
Step-by-step explanation:
The complete question in the attached figure
Let
x ------> the number of students in fourth grade
s -----> the number of students at the basketball game
we know that
The number of students at the basketball game is four times the number of students in fourth grade
so
The linear expression is
-----> equation A
-----> equation B
substitute equation B in equation A and solve for y


therefore
200 students attended the basketball game