1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Temka [501]
4 years ago
7

Solve the equation using the quadratic formula 3x^2 =2(2x+1)

Mathematics
2 answers:
shtirl [24]4 years ago
5 0
3x² = 2(2x+1)


Expand the brackets

3x² = 4x + 2


Rearrange

3x² - 4x - 2 = 0


Quadratic formula is

(-b ± √(b² - 4ac)) / 2a


Where

a = 3
b = -4
c = -2


Therefore, putting these values in to the quadratic formula:

x = 15.487
or
x = -3.487

Round the answers how you will.
Nadusha1986 [10]4 years ago
3 0
Step 1: Make equation equal to Zero

3x^2 = 4x + 2


3x^2 - 4x - 2 


Step 2: use equation

a= 3 b = -4 c= -2 

after plugging in answer should be

(2 + or - sqrt 10) / 3 


You might be interested in
I'm not very good at solving these problems
notka56 [123]

1 atom of C has a mass of 12 amu (atomic mass unit).

1 atom of O has a mass of 16 amu.

1 molecule of CO₂ thus has a mass of 12 + 2×16 = 44 amu.

C thus makes up 12/44 ≈ 0.27 of the total mass of CO₂, while O makes up the remaining 32/44 ≈ 0.73.

Then in a 2 kg = 2000 g block of CO₂, carbon makes up about 12/44 × 2000 ≈ 545 g.

7 0
2 years ago
What is the conjugate of -2 + 8i
topjm [15]

Answer:

-2 - 8i

Step-by-step explanation:

To find the conjugate of a complex number, change the sign of the imaginary part.

The conjugate of -2 + 8i is -2 - 8i.

3 0
3 years ago
A construction crew has just finished building a road. The road is 8 2/5 kilometers long. If the crew worked for 6 days, how man
Misha Larkins [42]
Answer: 1.4 or 1 2/5

Reason: if you were to do 8.4÷6 you would get 1.4 and to check your work you can do 1.4×6 which is 8.4 or 8 2/5
7 0
3 years ago
Rick and Debbie are painting a large barn. Debbie paints twice as fast as Rick. They work together for 16 hours and complete the
avanturin [10]

Answer:

Step-by-step explanation:

Rick and Debbie are painting a large barn. Debbie paints twice as fast as Rick. They work together for 16 hours and complete the job. Determine how fast Debbie and Rick can paint the entire barn separately.

= 1/a + 1/2a = 1/16

= 2a + a/2a² = 1/16

2a/2a² = 1/16

= 1/a = 1/16

6 0
3 years ago
A lawyer charges his clients a consultation fee of $500 and $100 per hour to work on a case. This is represented by the linear f
Elis [28]
They would make 2,000 because 150X10=1,500+500
5 0
3 years ago
Read 2 more answers
Other questions:
  • PLEASE HELP ME WITH THIS
    11·1 answer
  • $420 for 15 tickets = ?
    15·2 answers
  • A recent census listed the population of a city as 831,982. Marisol rounds the population to 830,000 and lindy rounds the popula
    15·2 answers
  • Bruce bought the enormous box of juice shown below. Each day he plans to drink 630 cubic centimeters of
    11·2 answers
  • One kilometer equals how many meters?
    14·2 answers
  • What is 2.26 (6 repeating) as a fraction?
    10·1 answer
  • A pet supply chain called Pet City has 5 hamsters and 10 gerbils for sale at its Lanberry location. At its Milford location, the
    14·1 answer
  • Please helpp<br> meeee<br> agf akgfkef eafef f
    13·2 answers
  • The length of the base of an isosceles triangle is 8 yards. The height of the triangle is 11 yards. Find the area of the triangl
    8·2 answers
  • What is the slop of 2x-5y=10
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!