Answer:
A. finished 1km
Step-by-step explanation:
b. 8km per hour
<span>0.00006628369 is your answer for 0.45/6789</span>
Answer:
100000000000000000000000020
Step-by-step explanation:
There you go
Answer:
12. -11
13. 2
Step-by-step explanation:
12. First recall the order of operations (BEDMAS): Brackets, Exponents, Division, Multiplication, Addition, Subtraction
For question 12 there is a division and its priority is before other operations in the equation so you must divide 16/-2 first which gives you -8.
From there because addition and subtraction is on the same level of order, you would do the question straight as it is shown (but replace 16/-2 with -8.
Your new equation is -10-8+7 = -11
13. follow the same as above using BEDMAS. It may help to look at it with additional brackets: ((-68)/(-4)) + ((5 x (-3))
- keep in mind there’s an addition between the two
Division and multiplication is on the same level in BEDMAS so first divide -68/-4 = 17
Second multiply 5 x -3 = -15
Now you can combine the two answers using addition: 17 + (-15) = 2
B should be the only correct answer.