Answer: b. 0.98
Step-by-step explanation:
The formula to find the maximum error of the estimated mean :
(1)
, where
= standard deviation
n= Sample size
z* = Critical z-value.
As per given , we have

n=100
Critical value for 95% confidence interval = z*=1.96
Put these values in the formula (1), we get


Hence, the maximum error of the estimated mean quality for a 95% level of confidence is 0.98.
Therefore , the correct answer is b. 0.98 .
Answer: Vertex
Step-by-step explanation:
To solve this exercise you must keep on mind the definitions shown below:
1. By definition, a regular pyramid is a right pyramid whose base is a regular polygon.
2. By definition, a regular polygon is a polygon whose sides have equal lenghts.
3. By definition the apex (which is the vertex at the tip of the pyramid) of a right pyramid lies directly above the center of the base.
Therefore, keeping the above on mind, you can conclude that:
A regular pyramid has a regular polygon base and a Vertex over the center of the base.
There are 12 inches per foot. If the tree is 48 feet tall, it is 48 x 12 = 576 inches tall.
The is The 103.8 Cause Of the math is correct
Answer:
7
Step-by-step explanation:
he can iron 7 in 21 minutes
hope this helps