PSYCHO15rus [73]
4 years ago
13

A civil engineer tested concrete samples to investigate the difference in strength, in newtons per square millimeter (N/mm2), be

tween concrete hardened for 21 days and concrete hardened for 28 days. The engineer measured the strength from each sample, calculated the difference in the mean strength between the samples, and then constructed the 95 percent confidence interval, (2.9,3.1), for the difference in mean strengths.
Assuming all conditions for inference were met, which of the following is a correct interpretation of the 95 percent confidence level?

a) In repeated samples of the same size, approximately 95 percent of the samples will yield the interval 2.9 N/mm^2 to 3.1 N/mm^2.

b) In repeated samples of the same size, approximately 95 percent of the sample means will fall between 2.9 N/mm^2 and 3.1 N/mm^2
c)In repeated samples of the same size, approximately 95 percent of the intervals constructed from the samples will extend from 2.9 N/mm^2 to 3.1 N/mm^2.

d)In repeated samples of the same size, approximately 95 percent of the intervals constructed from the samples will capture the population difference in means.

e) In repeated samples of the same size, approximately 95 percent of the intervals constructed from the samples will capture the sample difference in means.
Mathematics
1 answer:
xxTIMURxx [149]4 years ago
3 0

Answer: d)In repeated samples of the same size, approximately 95 percent of the intervals constructed from the samples will capture the population difference in means.

Step-by-step explanation:

Confidence interval is constructed to estimate a range of values that could possibly contain the population parameter. This could be the population mean or population proportion. A 95 percent confidence interval does not mean 95% probability. It tells how confident that we are that the confidence interval contains the population proportion. If we construct 100 of the given confidence interval, we are confident that 95% of them would contain the true population parameter. Therefore, the correct option is

d)In repeated samples of the same size, approximately 95 percent of the intervals constructed from the samples will capture the population difference in means.

You might be interested in
Do 4 x 10 to the 3rd power and 4 divided by 10 to the 3rd power.
DIA [1.3K]

Answer: Product means the answer to a multiplication problem

4 0
3 years ago
Read 2 more answers
Which of these numbers is irrational? A) −0.125 B) −50 C) π D) 7 10
Marrrta [24]
Your answer would be C
7 0
4 years ago
Read 2 more answers
Find the common difference of an Arithmetic progression of 7,11,15,19...​
docker41 [41]

Answer:

+4

Step-by-step explanation:

The numbers above are all odd number

The arithmetic progression is the addition of +4

7+4=11

11+4=15

15+4=19

5 0
4 years ago
What is the equation of the line graphed below? (3,-1) A. y=1/3x B. y=x C. y=-3x D. y=- 1/3x
Rzqust [24]

A line is a one-dimensional shape that is straight, has no thickness, and extends in both directions indefinitely. The correct option is A.

<h3>What is the equation of a line?</h3>

A line is a one-dimensional shape that is straight, has no thickness, and extends in both directions indefinitely. The equation of line is given by,

y =mx + c

where,

x is the coordinate of the x-axis,

y is the coordinate of the y-axis,

m is the slope of the line, and

c is constant.

The graph of the question is mentioned below.

If we look the function given below then it can be observed that the given graph is linear. Also, the line passes through (0,0) and (3,1).

The slope of the line is,

Slope, m = (1-0)/(3-0) = 1/3

The y-intercept of the line is at the origin. Thus, the equation can be written as,

y = (1/3)x + 0

y = (1/3)x

Hence, the correct option is A.

Learn more about Equation of Line:

brainly.com/question/21511618

#SPJ1

5 0
2 years ago
Determine the critical value or values for a one-mean z-test at the 10% significance level if the hypothesis test is left-tailed
Ugo [173]

Answer: 1.282

Step-by-step explanation:

Given : Significance level : \alpha= 10\%=0.10

The alternative hypothesis : H_a:\mu, which is left tail-ed , it means the test is left -tailed test i.e. one -tailed test.

By using the standard normal distribution table , we have

The critical value for a one-mean z-test corresponding to the significance level 0.10 is 1.2815515 or approximately 1.282

Hence, the  critical value or values for a one-mean z-test at the 10% significance level if the hypothesis test is left-tailed = 1.282

5 0
3 years ago
Other questions:
  • Sam and Carlos are bully with the plastic pins in Sam's living room. Remarkably Sam knocks down eight pins on every bowl and Car
    13·1 answer
  • What is the domain and range of the relation shown in the table?
    8·1 answer
  • What are some <br> famous formula
    11·1 answer
  • Find the domain and range.<br> y=3^x
    5·2 answers
  • 6 + 8 ( x - 1) = 2 (3x + 4)
    12·1 answer
  • What is 3 times pi? pi is in the picture like that’s the symbol.
    7·2 answers
  • Answer correctly please
    10·2 answers
  • What is the square root of49
    9·2 answers
  • Who knows how to do this pls show work
    11·2 answers
  • In ΔIJK, k = 7.2 cm, ∠J=55° and ∠K=67°. Find the length of i, to the nearest 10th of a centimeter.
    8·1 answer
Add answer