I think all you do is $32,000 / $8,000 which is $4,000.
Meaning $4,000 will be invested in each investment, I may be wrong though.
For the answer to the question above, first, we must calculate the standard error. The standard error is standard deviation divided by the square root of the sample. In this case, it is equal to 0.178. The z-score has defined the distance from the sample to the population mean in units of standard error.
z = (3 – 2.5)/0.178 = 2.81
at this z-score, the probability is 0.9974 or
if rounded off it is 1%
I hope my answer helped
Answer:
1.42 cm
Step-by-step explanation:
2.5 m = 98.4251 inches
98.4251 in / 11.5 in =8.5587
.5587 inches left over =1.42 cm
The answer to the question ought to be 10
Answer:
the picture is not clear for me I can't see anything sorry