Answer: x=7.5
Step-by-step explanation:
Answer:
12/7 hours
Step-by-step explanation:
First find the rate for hour for the two. For Lianne she can do 1/3 of the job per hour. For Julie she can do 1/4 of the job per hour.
Adding them together, 1/3+1/4= 7/12.
This 7/12 means that working together they can finish 7/12 of a job in an hour. We can use the speed*time=distance formula here and see that
7/12 * time = 1 job done
time = 12/7 hours.
Answer: No he does not meet both of his expectation by cooking 10 batches of spaghetti and 4 batches of lasagna.
Step-by-step explanation:
Since here S represents the number of batches of spaghetti and L represents the total number of lasagna.
And, the chef planed to use at least 4.5 kilograms of pasta and more than 6.3 liters of sauce to cook spaghetti and lasagna.
Which is shown by the below inequality,
----------(1)
And,
--------(2)
By putting S = 10 and L = 4 in the inequality (1),

⇒
(true)
Thus, for the values S = 10 and L = 4 the inequality (1) is followed.
Again By putting S = 10 and L = 4 in the inequality (2),

⇒
( false)
But, for the values S = 10 and L = 4 the inequality (2) is not followed.
Therefore, Antonius does not meet both of his expectations by cooking 10 batches of spaghetti and 4 batches of lasagna.