1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
cluponka [151]
3 years ago
13

8а-(1+5a)=4(За –11)-20

Mathematics
1 answer:
lisabon 2012 [21]3 years ago
4 0

Answer:a= -21

Step-by-step explanation:

You might be interested in
Give two different sequences of three transformations that would map PQR onto EFG given that PQR=EFG.
Gre4nikov [31]

9514 1404 393

Answer:

  1. Translate P to E; rotate ∆PQR about E until Q is coincident with F; reflect ∆PQR across EF
  2. Reflect ∆PQR across line PR; translate R to G; rotate ∆PQR about G until P is coincident with E

Step-by-step explanation:

The orientations of the triangles are opposite, so a reflection is involved. The various segments are not at right angles to each other, so a rotation other than some multiple of 90° is involved. A translation is needed in order to align the vertices on top of one another.

The rotation is more easily defined if one of the ∆PQR vertices is already on top of its corresponding ∆EFG vertex, so that translation should precede the rotation. The reflection can come anywhere in the sequence.

__

<em>Additional comment</em>

The mapping can be done in two transformations: translate a ∆PQR vertex to its corresponding ∆EFG point; reflect across the line that bisects the angle made at that vertex by corresponding sides.

3 0
3 years ago
Read 2 more answers
Solve: y=-3x+5 5x-4y=-3
Dafna1 [17]
Use y=-3x+5 on this equation 5x-4y=-3

5x-4(-3x+5) = -3
5x+12x-20 = -3
17x=17
x=1

y=-3x+5
for x=1;
y=-3+5
y=2
7 0
3 years ago
Write an equation in point slope form of a line that passes through the given point and has the given slope.
maxonik [38]

the equation of a line in point-slope form is

y - b = m(x - a)

where m is the slope and (a, b) a point on the line

here m = - 2 and (a, b) = (2, 6), hence

y - 6 = - 2(x - 2) ← equation in point-slope form


8 0
4 years ago
The penny size of a nail indicates the length of the nail. The penny size d
Korvikt [17]

By working with the given linear equation we will see that:

a) n = (d + 2)/4

b)

  • A 3-penny nail is_5/4_inches.
  • A 6-penny nail is_2_inches.
  • A 10-penny nail is_3_inches.

<h3>How to solve the equation for n?</h3>

Here we have the linear equation:

d = 4n - 2

We want to solve it for n, it means that we need to isolate n in one side of the equation.

If we first add 2 in both sides of the equation, and then we divide both sides by 4, we will get:

d + 2 = 4n

(d + 2)/4 = n

That is the equation solved for n.

b) The penny size is d, and n is the length of the nail, then:

if d = 3, we have:

n = (3 + 2)/4 = 5/4

if d = 6, then:

n = (6 + 2)/4 = 2

if d = 10, then:

n = (10 + 2)/4 = 3

Thus:

  • A 3-penny nail is_5/4_inches.
  • A 6-penny nail is_2_inches.
  • A 10-penny nail is_3_inches.

if you want to learn more about linear equations:

brainly.com/question/1884491

#SPJ1

6 0
2 years ago
A sample of 11001100 computer chips revealed that 62b% of the chips fail in the first 10001000 hours of their use. The company's
STALIN [3.7K]

Answer:

Rule

If;

P-value > significance level --- accept Null hypothesis

P-value < significance level --- reject Null hypothesis

Z score > Z(at 90% confidence interval) ---- reject Null hypothesis

Z score < Z(at 90% confidence interval) ------ accept Null hypothesis

Null hypothesis: H0 = 0.60

Alternative hypothesis: Ha <> 0.62

z score = 1.35

P value = P(Z<-1.35) + P(Z>1.35) = 0.0885 + 0.0885= 0.177

Since z at 0.10 significance level is between -1.645 and +1.645 and the z score for the test (z = 1.35) falls with the region bounded by Z at 0.1 significance level. And also the two-tailed hypothesis P-value is 0.177 which is greater than 0.1. Then we can conclude that we don't have enough evidence to FAIL or reject the null hypothesis, and we can say that at 0.10 significance level the null hypothesis is valid.

Question; A sample of 1100 computer chips revealed that 62% of the chips fail in the first 1000 hours of their use. The company's promotional literature states that 60% of the chips fail in the first 1000 hours of their use. The quality control manager wants to test the claim that the actual percentage that fail is different from the stated percentage. Determine the decision rule for rejecting the null hypothesis, H0, at the 0.10 level.

Step-by-step explanation:

Given;

n=1100 represent the random sample taken

Null hypothesis: H0 = 0.60

Alternative hypothesis: Ha <> 0.62

Test statistic z score can be calculated with the formula below;

z = (p^−po)/√{po(1−po)/n}

Where,

z= Test statistics

n = Sample size = 1100

po = Null hypothesized value = 0.60

p^ = Observed proportion = 0.62

Substituting the values we have

z = (0.62-0.60)/√{0.60(1-0.60)/1100}

z = 1.354

z = 1.35

To determine the p value (test statistic) at 0.01 significance level, using a two tailed hypothesis.

P value = P(Z<-1.35) + P(Z>1.35) = 0.0885 + 0.0885= 0.177

Since z at 0.10 significance level is between -1.645 and +1.645 and the z score for the test (z = 1.35) falls with the region bounded by Z at 0.1 significance level. And also the two-tailed hypothesis P-value is 0.177 which is greater than 0.1. Then we can conclude that we don't have enough evidence to FAIL or reject the null hypothesis, and we can say that at 0.10 significance level the null hypothesis is valid.

3 0
4 years ago
Other questions:
  • Body armor provides critical protection for law enforcement personnel, but it does affect balance and mobility. The article "Imp
    9·1 answer
  • What is the perimeter of a rhombus shape street sign with a 35cm side
    15·1 answer
  • PLEASE HELP 12 POINTS
    13·2 answers
  • A rectangle with an area of 24 square units might have dimensions of 2x12. Name two other sets of dimensions that would be possi
    11·2 answers
  • What are binary numbers
    5·2 answers
  • Josh poured 38 gallons of water into 6 buckets he poured the same amount into each bucket how much water did josh pour into each
    14·1 answer
  • Please answer all of these in the following way :
    7·1 answer
  • It takes 12 men 5 days to complete a job.
    10·1 answer
  • What is 437 squared If you know please help me im doing exams Right now. Have a great day.
    5·2 answers
  • Ok Same Thing But Different Questions
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!