if three bakers can prepare 15 cakes in 60 minutes, how long will it take six bakers working at the same rate to prepare 20 cak
es?
1 answer:
-- 3 bakers produce 15 cakes in 60 minutes.
-- Each baker produces 15/3 = 5 cakes in 60 minutes.
-- Each baker takes 60/5 = 12 minutes to produce 1 cake.
-- 6 bakers can produce 6 cakes in 12 minutes.
-- 20 cakes will take 20/6 = (3 and 1/3) as much time as 6 cakes.
-- (3 and 1/3) times 12 minutes = <em>40 minutes</em>.
================================================
An easier way to do it:
-- 3 bakers produce 15 cakes in 60 minutes.
-- 6 bakers could produce 30cakes in 60 minutes.
-- Only 20 cakes are needed. That's only (20/30) = 2/3 of 30 cakes.
-- So it will only take them 2/3 of 60 minutes = <em>40 minutes</em> to make them.
You might be interested in
Answer:
1 inch represents 60 feet.
Step-by-step explanation:
120/2
= 60
So his scale is 1:60
If I understood the question correctly, the answer would be 400
Answer:
The sum is equal to 5
Step-by-step explanation:
we know that
The algebraic expression of the phrase " the sum of negative two squared plus one" is equal to

Answer:
the answer is 2
Step-by-step explanation:
Answer:
y=x+6
Step-by-step explanation:
slope is 1
y intercept is 6