Answer:
no
Step-by-step explanation:
fifty eight hundreths= 5,800
5.8<5,800
Answer:
(7,9)
Step-by-step explanation:
Use the midpoint formula to find the midpoint of the line segment.
Given:
m∠APD = (7x + 1)°
m∠DPC = 90°
m∠CPB = (9x - 7)°
To find:
The measure of arc ACD.
Solution:
<em>Sum of the adjacent angles in a straight line = 180°</em>
m∠APD + m∠DPC + m∠CPB = 180°
7x° + 1° + 90° + 9x° - 7° = 180°
16x° + 84° = 180°
Subtract 84° from both sides.
16x° + 84° - 84° = 180° - 84°
16x° = 96°
Divide by 16° on both sides.
x = 6
m∠APB = 180°
m∠BPD = (9x - 7)° + 90°
= (9(6) - 7)° + 90°
= 47° + 90°
m∠BPD = 137°
m∠APD = m∠APB + m∠BPD
= 180° + 137°
= 317°
<em>The measure of the central angle is congruent to the measure of the intercepted arc.</em>
m(ar ACD) = m∠APD
m(ar ACD) = 317°
The arc measure of ACD is 317°.
Answer:
Side length and perimeter of 1 face
Area of 1 face and surface area
Step-by-step explanation:
Suppose you are given cube with side length of x units.
Then
Side length = x units
Perimeter = 4x units
Area of 1 face
square units
Surface area
square units
Volume
cubic units
A linear relationship is any equation that, when graphed, gives you a straight line.
Consider all options:
A. Side length and perimeter of 1 face is a linear relationship, because the graph of the function
is a straight line.
B. Perimeter of 1 face and area of 1 face is not a linear relationship, because the graph of this relationship is a quadratic parabola with equation
.
C. Surface area and volume is not a linear relationship, because the graph of this relationship is a curve with equation
.
D. Area of 1 face and surface area is a linear relationship, because the graph of the function
is a straight line.
E. Side length and volume is not a linear relationship, because the graph of this relationship is a cubic parabola with equation
.
Step-by-step explanation:
T = time in seconds
H = distance
Tground = time to return to ground
Tmax = time at maximum height
H = -16T^2 + 672T...eqn 1
projectile returns to ground at H =0,
subs for H in eqn 1...
0 = -16T^2 + 672T
solving for T we get...
16T^2 = 672T
=> Tground = 42secs
Tmax = 0.5 Tground = 21secs