Largest exponent in a polynomial is called it’s Degree
a. 
b. For every month the pine tree grows about 0.67 inches.
c. <em> </em>It represents the height of the tree at the moment Ariel started to record the heights.
<h2>
Explanation:</h2>
<h3>PART A.</h3>
In this exercise we have that in July Ariel recorded the height of a pine tree and how quickly it was expected to grow in next several months. From the Table, we can get the following points:

It is obvious that this problem follows a linear equation, so our goal is to find the equation that matches the Table.
The point slope form of the equation of a line is:

Finding (m):

Finally, the equation of the line is:

<h3>
PART B.</h3>
In this case, we have that:
- The x-axis represents the <em>Number of Months </em>the pine tree was expected to grow.
- The y-axis represents the <em>Height of the Tree </em>in inches.
Since the slope o a line is:

Then, this means that<em> every three months the pine tree grows two inches, </em><em>or </em><em>for every month the pine tree grows about 0.67 inches.</em>
<h3>PART C.</h3>
The y-intercept can be found setting
. So, from our equation:

So the y-intercept is
and<em> represents the height of the tree at the moment Ariel started to record the heights.</em>
<h2>Learn more:</h2>
Slope Intercept form: brainly.com/question/4192440
#LearnWithBrainly
Answer:
The answer your looking for is no, because in any certain type of triangle. Each triangle is 180 degrees like trying to find the missing angle of a triangle.
Step-by-step explanation:
I am pretty sure the value of ‘n’ is 2.5!
Answer:
The correct evaluation is 1 1/3 (one and one-third) and not 16 and one-third
Step-by-step explanation:
The student was wrong in his evaluation because the correct result should be 1 1/3 (one and one-third) and not 16 and one-third
The expression '1/3 more than the product of four and a number' means
(4g + 1/3)
Evaluating the expression when g = 1/4
You will have
4×1/4 + 1/3
= 1/1 + 1/3
Find the LCM of 1 and 3 and add
= (3+1)/3
=4/3
= 1 1/3
The correct evaluation is 1 1/3 (one and one-third) and not 16 and one-third