The answer would be x=-7
Please put me as a Brainlier
First, let x be the number of hours it will take for Hector to finish the same job alone. This means that every hour, Hector can do 1/x of the job. The amount of work done by Shawn and Hector in 6 hours should be equal to 1 complete work. This can be expressed as,
(1/9 + 1/x)(6) = 1
The value of x is 18. Thus, Hector can to 1/18 of the job in one hour.
Two less than the quotient of a number cubed and four, increased by eight
six times the difference of five and a number squared;
(4, 2) ----> ( 2, 1)
(4 - 2, (2 - 1) ----> (2, 1)
That's a vertical -1 and horizontal of -2.
That's the last choice.
AA Postulate. You have two angles available for both triangles.