Answer:
A.) f(x) = 45 - 4(x - 1)
Step-by-step explanation:
Answer:
a) 9000 ft-lb
b) 9000 ft-lb
Step-by-step explanation:
Equation for the work:
The equation for the work done is given by:

In which F is the force needed and d is the distance. The time does not interfere on the work.
A 300-lb gorilla climbs a tree to a height of 30 ft
This means that 
Thus

The work done in both cases is of 9000 ft-lb, as the work is not a function of time.
Answer: 15x-2
Step-by-step explanation: ?
Answer: y = 40x + 750
Step-by-step explanation:
Linear model;
y = mx + c
y is the total cost of buying granite counter tops for a certain number of square foot as well as the cost to install the counter top.
m is the cost of granite counter tops per square foot which is $40 in this case.
x is the number of square feet required.
c is the base pay for the installation of the counter top which is $750
Linear model will therefore look like this;
y = 40x + 750
To test it. Assume you want enough granite tops for 10 square feet. How much would it cost;
= 40 (10) + 750
= $1,150