Answer:
-7
Step-by-step explanation:
Let's try getting rid of the numbers to isolate the x.
Add x on both sides to get rid of the x on the right side and to get 2x on the left side. This leaves us with 15.3 + 2x = 1.3
Subtract 15.3 on both sides to get rid of the 15.3 on the left side.
This would leave us with 2x = -14
Divide 2 on both sides to isolate the x.
The answer is x = -7
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer:
Since its counting by 2 go between 0 and 2 which is one and go up the blue line so the answer is 10
Step-by-step explanation:
Answer:
it would be the graph with the maximum (opening down) in the first photo with the top on the left side of the y axis