Tim installs 50 square feet of his floor in 45 minutes. At this rate how long does it take him to install 495 square feet.
1 answer:
50 sqft = 45 min
495 sqft = x min
495/50 is 9.9. So we know we multiplied 50 by 9.9 to change it to 495.
Do the same on the other side. 45 x 9.9 = 445.5.
It will take him 445.5 minutes, or 7.425 hours
You might be interested in
Answer: Percentage of female workers = 40%
Step-by-step explanation: No of Female workers = 80
No of Male workers = 120
Total No of workers = 120+80= 200
percentage of female workers =80 of 200%= 40
Answer:
corresponding angle are:
<1=<5
<2=<6
<7=<3
<8=<4
<u><1&<5,<2&<6,<7&<3,<8&<4are pair corresponding angle.</u>
Answer:
you look at the lengths some triagles have small parallel lines anè or two of them to determine if they are equal or different from one another
Answer:
Step-by-step explanation:
5
3 _
18
Answer:
wat is the actual question for this??
Step-by-step explanation: