Answer :
no. of days used to repair 1250m of road = 5
no. of days used to repair 1m of road = 5/1250
no. of days used to repair 8000m of road (8*1000m ) = 5/1250*8000= 32 days
Answer:
Step-by-step explanation:
just replace x into the equation to see if y match with the table.
Answer:
F. Obtuse isosceles
Step-by-step explanation:
Since we have an angle that is 100 degrees, we have an obtuse angle
We have two angles that are 40, which means we have two sides that are equal length, because two angles have the same measure. That means it is isosceles
The triangle is an obtuse isosceles
Answer:
4.718592
Step-by-step explanation:
To get to -14.4 from 18 you multiply 18 x 0.8
Repeat that until you get to the 7th term
18 (1st)
18 x 0.8 = -14.4 (2nd)
-14.4 x 0.8 = 11.52 (3rd)
11.52 x 0.8 = 9.216 (4th)
9.216 x 0.8 = 7.3728 (5th)
7.3728 x 0.8 = 5.89824 (6th)
5.89824 x 0.8 = 4.718592 (7th)