Answer:
375
Step-by-step explanation:
12½[30] → 25⁄2[30]
Multiply 25 by 30 [750] then divide by 2 to get 375.
I am joyous to assist you anytime.
Correct answer is third option ---C in edge
Answer:
430 minutes or 7 hours and 10 minutes
Step-by-step explanation:
From 8:35 am to 9 am is 25 minutes. There are 60 minutes in an hour and 9 am to 3 pm is 6 hours. 3:00 to 3:45 pm is an additional 45 minutes.
60 minutes x 6 hours = 360 minutes
360 + 25 + 45 = 430 minutes
Answer:
Type I error.
Step-by-step explanation:
The decision to shut the process is triggered by the conclusion that the average height is significantly different from 66 mm.
This means that the null hypothesis, that states that the average height is not significantly different from 66 mm (μ=66), has been rejected.
If the null hypothesis is rejected, the error that can have been made is to reject a true null hypothesis, when the process is functioning to specification and the average length is not significantly different from 66.
This is a Type I error, that happens when a true null hypothesis is rejected.
Answer:
Given points ( -1 ,3 ) and slope(m) = -3
Step-by-step explanation:
<em>The </em><em>equation </em><em>of </em><em>a </em><em>line </em><em>is </em><em>given </em><em>by </em>
<em>y </em><em>-</em><em> </em><em>y1 </em><em>=</em><em> </em><em>m </em><em>(</em><em> </em><em>x </em><em>-</em><em> </em><em>x1</em><em> </em><em>)</em>
<em>y </em><em>-</em><em> </em><em>3</em><em> </em><em>=</em><em> </em><em>-</em><em>3</em><em> </em><em>(</em><em> </em><em>x </em><em>+</em><em>1</em><em> </em><em>)</em>
<em>y </em><em>-</em><em> </em><em>3</em><em> </em><em>=</em><em> </em><em>-</em><em>3</em><em>x</em><em> </em><em>-</em><em> </em><em>3</em>
<em>3x </em><em>+</em><em> </em><em>y </em><em>-</em><em>3</em><em> </em><em>+</em><em>3</em><em> </em><em>=</em><em>0</em>
<em>3x </em><em>+</em><em> </em><em>y </em><em>=</em><em> </em><em>0</em>
<em>which </em><em>is </em><em>the </em><em>required </em><em>equation </em>